Implementation Checklist
Review this list before testing, to ensure you've covered all the essentials.Try it ; }
Following is a list of the most common issues to verify for accurate RDX implementation.
Be sure to review this list before formal testing begins.
Verify these steps for RDX integration
- Review Solution Design Guide to confirm VCAS integration
- Review RDX specification version specific to the VCAS integration
- Confirm connectivity integration
- Confirm endpoint/port for staging and production
- Confirm URI for all in-scope RDX calls
- Verify that VCAS IP addresses have been allowed
- Identify RDX traffic capacity threshold
Updated about 1 year ago